Production readiness score

Fifteen questions across the six areas that stall hardware launches. You get a 0–100 score, the build stage your answers actually support, and your top three risks, each with a next action.

Start the check ↓ No sign-up. Your result appears on screen.
Q01 / 15 Design maturity
Which build are you on right now?

Design maturity

Each build stage retires a different class of risk.

Is the design frozen under change controlEngineering change order (ECO) The formal process for approving, documenting, and rolling out a design change to a released product, so factories, inventory, and records stay in sync. Glossary →?

Design maturity

Late changes are where schedules and toolingInjection mold tooling (soft vs hard) The molds that make plastic parts; soft tools are cheaper and faster but wear sooner, hardened steel tools cost more and last far longer. Glossary → budgets go.

Is your BOMBill of materials (BOM) The complete list of every part, quantity, and approved source needed to build a product; it drives purchasing, cost, and manufacturing. Glossary → complete, with manufacturer part numbers?

Electronics

A factory can only quote and buy from a precise BOM.

Do your critical parts have second sources?

Electronics

MCUMicrocontroller vs microprocessor An MCU is a self-contained chip with built-in memory running bare-metal or RTOS firmware; an MPU needs external memory and usually runs a full OS such as Linux. Glossary →, radio module, power ICs, connectors, display.

Do you know your longest component lead timeLead time The time between placing an order and receiving it; for some parts, tooling and production slots it runs to months and dictates the schedule. Glossary →?

Electronics

Your ship date is set by your slowest part.

Where is your production tooling?

Mechanical & DFMDesign for manufacturing (DFM) Designing parts and assemblies around how they will actually be made and put together, to cut cost, defects, and assembly time before tooling is made. Glossary →

Molds and fixtures are usually the largest NRENRE (non-recurring engineering) One-time costs to develop a product and prepare it for production, such as design, tooling, fixtures, and certification, as distinct from per-unit costs. Glossary → line.

Have you done tolerance stack-ups on critical fits?

Mechanical & DFM

Prototypes fit because they were hand-fit.

Has your manufacturer reviewed the design for manufacturability?

Mechanical & DFM

Cheap to fix in CAD, expensive to fix in steel.

Can you update firmware after units ship?

Firmware & test

Every product with firmware ships with bugs.

Do you have a factory test plan and fixtures?

Firmware & test

End-of-line testFunctional circuit test (FCT) Powering up a board or finished product and checking it actually works, such as sensors reading correctly and radios connecting, before it ships. Glossary → is what keeps bad units off trucks.

Do you know which certifications you need?

Compliance

Most electronics can't legally be sold without them.

Have you done pre-compliance testingPre-compliance testing Informal, lower-cost testing of prototypes against certification limits before the formal lab test, to find and fix problems while changes are still cheap. Glossary →?

Compliance

EmissionsEMI and EMC EMC means a device neither emits too much electromagnetic noise (EMI) nor malfunctions when exposed to it; most markets require testing to show both. Glossary →, immunity, radio, and safety, before the formal lab.

Have you selected a contract manufacturerContract manufacturer (CM / EMS) A company that builds your product to your design and specifications; EMS providers specialize in electronics assembly, often with box build and test. Glossary →?

Supply chain & cost

Your CM's process, test capability, and MOQs shape the design.

Do you know your landed costLanded cost The full cost of getting a unit to your warehouse: factory price plus freight, insurance, duties, tariffs, customs fees, brokerage, and handling. Glossary → per unit?

Supply chain & cost

BOM + assembly + test + packaging + freight + duty + yield loss.

Are your MOQs known and the first run funded?

Supply chain & cost

Tooling, parts, and deposits are paid before revenue.

Press 1–5 to answer
15 / 15 ANSWERED · RESULT BELOW

free review

Want an engineer to check your score?

Send your result to yourself, and get a free 15-minute review of it with an engineer who has taken products through EVTEVT (engineering validation test) The first build of production-intent design, used to prove the engineering works: does the product meet its functional and performance requirements? Glossary →, DVTDVT (design validation test) The build stage where units made with production-intent tooling and processes are tested for reliability, compliance, and environmental performance. Glossary →, and PVTPVT (production validation test) A pilot run on the real production line, at production pace, to prove the factory can build the product consistently at target yield and quality. Glossary →.

By sending this you agree to our Terms and confirm you've read our Privacy Policy.

How the score works

Each answer maps to a value from 0 to 1 (the full breakdown under your result shows every one). An area score is the weighted average of its answers. Weights run from 1.0 to 1.5 and reflect how often that gap derails a launch in our experience; they are our judgment, not a published standard. The overall score is the plain average of the six areas. Your stage is the lower of the build you said you're on and the stage your score supports (Concept under 25, Prototype 25+, EVT 45+, DVT 65+, PVT-ready 82+, and at least a DVT build). The top risks are your three largest weighted gaps.

This is an estimate to help you prioritize, not an audit, and not legal or compliance advice. Have an engineer review anything you're about to spend tooling or production money on.

How archetype helps with this

We close the gaps between prototype and production.

One team for the mechanical, electrical, and firmware work that turns your top risks into a production plan.

DFM, tooling, and fixtures

Design-for-manufacturing reviews, tolerance stack-ups, molds, jigs, and small-batch tooling. Mechanical & production

Bring-up, firmware, and factory test

Board bring-up, update paths, test plans, and end-of-line test stations. Firmware & electronics

Ready for the lab

Design choices that pass pre-compliance the first time, and a certification plan before DVT. Certification map

CASE STUDY Powered respirator helmet From concept to a small-batch assembly line, including a custom vacuum-forming machine with its own molds and tooling. Read the case study

FAQ

Questions founders ask

What do EVT, DVT, and PVT mean?

They are the three validation builds between a working prototype and mass productionMass production (MP) The stage after PVT where the factory builds at full rate, with ongoing quality control, change management, and cost reduction. Glossary →. EVT (engineering validation test) is the first integrated build on your own electronics, to prove the design works. DVT (design validation test) uses production-intent parts, often from production tooling, and is where reliability, environmental, and certification testing happen. PVT (production validation test) is built on the real production line, with production fixtures and processes, to prove the line can make the product at yield.

How is the score calculated?

Each answer maps to a value from 0 to 1. An area score is the weighted average of its answers; the weights (1.0 to 1.5) reflect how often that gap derails a launch in our experience. The overall score is the plain average of the six areas. Your stage is the lower of the build you said you are on and the stage your score supports. The top risks are your three largest weighted gaps. The full breakdown is shown under your result.

Is this a standard or a certification?

No. It is archetype's rubric, written by engineers, to help you see gaps early. It is an estimate, not an audit. Use it to decide what to look at next, and have an engineer review anything you are about to spend tooling money on.

What happens to my answers?

Your answers are encoded in the page link (the part after #) so you can share them with a cofounder. We record anonymous usage analytics, including your overall score, to improve the tool. We only get your email if you choose to send your result.

My score is low. Is that bad?

Not on its own. A low score at the prototype stage is normal. What matters is sequencing: the risks are ordered by impact, so fix them in that order before you spend on tooling or a production order.

More free tools: all tools · certification map · unit cost & NRE · battery life