archetype

Engineering change order (ECO)

also: ECO · ECN · change control · revision control

The formal process for approving, documenting, and rolling out a design change to a released product, so factories, inventory, and records stay in sync.

Once a design is in production, any change (a new part, a drawing update, a firmware version) ripples into purchasing, inventory, tooling, test, documentation, and possibly certification. An ECO records what changes, why, which units are affected (from which serial number or date), what happens to existing stock, and who approved it.

Revision control on drawings, BOMs, and firmware is the backbone: everyone must be building to the same revision.

Where it bites: informal changes ("just swap that capacitor") lead to mixed builds, untraceable field failures, and certifications that no longer match what ships. Changes to radios, antennas, power supplies, or safety-critical parts can require re-testing or new certification.

Founder takeaway

Set up revision control and a lightweight ECO process before PVT, and check every change for certification impact.

Ask an engineer