Unit cost & NRE model

What each unit really costs at your volume, what toolingInjection mold tooling (soft vs hard) The molds that make plastic parts; soft tools are cheaper and faster but wear sooner, hardened steel tools cost more and last far longer. Glossary → and engineering add on top, your margin in DTC and in retail, and the volume where it all pays back. Live as you type.

No sign-up Shareable link Estimates only · sources cited
Inputs defaults prefilled · edit any
01Per-unit build cost

Parts, PCB, and enclosure, as quoted.

The volume that BOMBill of materials (BOM) The complete list of every part, quantity, and approved source needed to build a product; it drives purchasing, cost, and manufacturing. Glossary → price is for.

Scrapped units still use parts and labour.

Assumption. Ask for an open-book quote.

Assumption. Duty depends on your product’s HTS codeHS/HTS code and import duties The tariff classification number that identifies a product at customs and sets its import duty rate; the first six digits are harmonized internationally. Glossary → and country of origin: look it up on the USITC HTS; only CBP rulings are binding [4].

02One-time costsNRE (non-recurring engineering) One-time costs to develop a product and prepare it for production, such as design, tooling, fixtures, and certification, as distinct from per-unit costs. Glossary →

Design, prototypes, DFMDesign for manufacturing (DFM) Designing parts and assemblies around how they will actually be made and put together, to cut cost, defects, and assembly time before tooling is made. Glossary →, test fixtures.

Injection molds: ~$2–5k aluminum for short runs, up to $100k+ for multi-cavity steel [2].

One itemized FCC/ISEDISED certification (Canada) Canada's radio and EMC approval regime, run by Innovation, Science and Economic Development Canada; similar to FCC rules, with its own requirements. Glossary →/CE quote for a radio module: ~$12k [3]. Plan yours.

03Production volume

One-time costs are spread over this many units, and the BOM is priced at this volume. Tap the chart to set it too.

04Price & channel

Both are always computed; this one leads.

05Margin stack

What comes off the shelf price before it reaches you. Typical values, editable.

Direct to consumer

Stripe’s standard US card rate: 2.9% + 30¢ [5].

Pick, pack, and postage you pay. Assumption.

Retail / wholesale

Commonly 30–40% [6]; keystone is 50% [7].

0 if you sell to retailers directly.

Returns, co-op marketing, chargebacks.

06Price breaksassumption

8% = a 92% learning curve. NASA rules of thumb: purchased parts 85–88%, electronics manufacturing 90–95% [1]. Calibrate with two quotes: drop = 1 − (price at 2× ÷ price at 1×). The curve stops at 100k units.

Live result estimate · not a quote
All-in cost per unit · at 2,000 units $135.98 landed $60.98one-time per unit $75.00
Landed costLanded cost The full cost of getting a unit to your warehouse: factory price plus freight, insurance, duties, tariffs, customs fees, brokerage, and handling. Glossary →$60.98per unit, delivered
One-time / unit$75.00$150,000 ÷ 2,000
MSRPChannel margin The share of the retail price kept by distributors and retailers; selling through channels means you earn the wholesale price, not the shelf price. Glossary → ÷ landed3.26×
DTC margin65%
Retail margin46%
Break-even2,761units
All-in cost per unit vs volume
  • all-in
  • landed
  • DTC net revenue
  • retail net revenue

All-in and landed cost per unit at sample volumes
UnitsLandedAll-in
Cost stack at this volume

Want a second opinion on these numbers? An engineer can tell you where the cost really is.

free review

Want an engineer to check this model?

Send the result to yourself, and get a free 15-minute review of your cost stack with an engineer.

By sending this you agree to our Terms and confirm you've read our Privacy Policy.

How this is calculated
  1. BOM at volume = quoted BOM × (volume ÷ quote volume)log₂(1 − drop). A learning curve standing in for price breaks [1]; it stops at 100k units.
  2. Factory cost = (BOM + labour) ÷ yield + packaging. Scrap consumes parts and labour; packaging goes on after test.
  3. Landed = factory cost × (1 + CMContract manufacturer (CM / EMS) A company that builds your product to your design and specifications; EMS providers specialize in electronics assembly, often with box build and test. Glossary → markup) × (1 + freight & duties).
  4. One-time per unit = (NRE + tooling + certification) ÷ volume. All-in = landed + one-time per unit.
  5. Net revenue: DTC = MSRP × (1 − payment % − returns %) − per-order fee − fulfilment. Retail = MSRP × (1 − retailer) × (1 − distributor) × (1 − allowances).
  6. Gross marginGross margin Revenue minus cost of goods sold, as a percentage of revenue; it shows how much each sale leaves to pay for engineering, marketing, overhead, and profit. Glossary → = (net revenue − landed) ÷ net revenue. Status: healthy ≥ 50% [8], thin 30–50%, risk below 30%. MSRP ÷ landed: healthy ≥ 4×, thin 3–4×, risk below 3× [9].
  7. Break-even = the smallest volume where volume × (net revenue − landed) covers the one-time costs: where the all-in curve crosses the revenue line on the chart.
  8. Knee = the volume past which one-time costs add less than 10% to the landed cost.

How archetype helps

Turn this estimate into a cost model you can build to.

We take physical products from prototype to production: DFM reviews that take cost out before tooling is cut, contract-manufacturer quotes at your real volume, test fixtures that raise yield, and certification plans sized to the product.

For a geotechnical client we turned an off-the-shelf drill into a precision soil sampler and delivered ten units with an assembly manual: a small batch, built to be repeated.

Start a project ↵

FAQ

Questions founders ask

What is the difference between landed cost and all-in cost?

Landed cost is what one finished unit costs once it is in your warehouse: parts, labour, scrap, packaging, the contract manufacturer’s markup, freight, and duty. All-in cost adds your one-time costs (engineering, tooling, certification) spread over the units you build.

Gross margin is normally quoted on landed cost. All-in cost tells you whether this production run pays back what it took to get here.

What gross margin should a hardware product have?

A common founder rule of thumb is at least 50% gross margin on device sales; below that, the price is probably too low to fund marketing, returns, and the next product [8]. For retail, plan a shelf price of at least 3× your landed cost; some of the most successful consumer hardware runs 4–5× [9].

The retailer’s cut comes out of that multiple. Retailers commonly keep 30–40% of the shelf price [6], and keystone pricing is 50% [7].

Why does unit cost fall so fast with volume, then flatten?

Two effects. One-time costs divide by volume: $150,000 of engineering, tooling, and certification is $1,500 a unit at 100 units and $15 at 10,000. And parts get cheaper in quantity, which this model approximates with a learning curve you can edit [1].

Past the knee marked on the chart, one-time costs add less than 10% to each unit; more volume then mostly buys cheaper parts, not cheaper tooling.

How accurate is this?

It is an estimate for decisions, not a quote. The structure is standard and every assumption is visible; the defaults describe a plausible connected consumer device. Duty in particular depends on your HTS classification and country of origin, and only CBP can rule on it [4].

Replace each default with a real quote as you get one. The link in your address bar keeps your numbers, so you can come back or share it.

How do I bring my unit cost down?

In rough order of leverage: design for manufacture before you cut tooling (fewer parts, fewer operations, standard fasteners), qualify second sources for expensive components, get open-book quotes from two or three contract manufacturers at your real volume, raise first-pass yieldYield (first-pass yield) The percentage of units that pass each production step, or the whole line, without rework; low yield directly raises cost and signals process problems. Glossary → with proper test fixtures, and use pre-certified radio modules to shrink certification.

That is the work archetype does between prototype and production. See services.

Sources & assumptions

Defaults are starting points drawn from these sources, not quotes for your product. Every number above is editable; replace them with your own quotes as soon as you have them.

  1. NASA Cost Estimating Handbook (2002), §7.6 learning-curve rules of thumb — reproduced in a NASA GSFC PRICE H briefing — purchased parts 85–88%, electronics manufacturing 90–95%, raw materials 93–96% per doubling of quantity (p. 10). Our 8% BOM drop per doubling = a 92% curve.
  2. Formlabs — How to estimate injection molding cost — aluminum molds for ~1,000–5,000 parts $2,000–5,000; molds for 10,000+ runs $5,000–100,000; complex multi-cavity steel $100,000+.
  3. SparkFun — Getting a module FCC certified — an itemized quote for a Bluetooth module: FCC Part 15CFCC Part 15 US rules on radio-frequency emissions from electronics: Subpart B for unintentional radiators, Subpart C for intentional ones such as Wi-Fi and BLE. Glossary → ~$4,000, ISED ~$3,600 incl. fee, CE REDRadio Equipment Directive (RED) The EU directive (2014/53/EU) for products that transmit or receive radio, covering spectrum use, EMC, safety and, for now, some cybersecurity. Glossary → + LVDLow Voltage Directive (LVD) The EU electrical-safety directive (2014/35/EU) for equipment rated 50–1,000 V AC or 75–1,500 V DC; lower voltages fall under other safety rules. Glossary → ~$4,600; ~$12,200 total. Quotes vary widely with radios and markets.
  4. USITC — Harmonized Tariff Schedule (hts.usitc.gov) and classification FAQ — classification starts in the HTS; only U.S. Customs and Border Protection can issue a binding ruling. Anti-dumping and other special duties are not in the HTS.
  5. Stripe — pricing (United States) — standard online card rate 2.9% + 30¢; international cards and currency conversion add more.
  6. Charlie Kindel — Retail pricing, markup, and margins (2012) — consumer-electronics retailers “as a rule of thumb, generally extract a 30–40% markup”.
  7. eightx — What is keystone markup? — keystone = pricing at 2× cost: a 100% markup on cost and a 50% gross margin.
  8. Adafruit Learn — How to build a hardware startup: pricing your product (Marc Barros) — “If your gross margin is less than 50% your price is too low.”
  9. Sinovation Ventures — Consumer IoT start-up advice: what margins does your hardware need? — “the SRP should be at least 3X COGSCOGS (cost of goods sold) The direct cost of producing the units you sold: materials, manufacturing labor, test, packaging, freight, and duties. It is much more than the BOM alone. Glossary →”; “some of the most successful consumer hardware products have a 4X or 5X SRP to COGS ratio.”
Ask an engineer