Free tool · 2 minutes
Certification map
Tap where you'll sell, how it's powered, and what radios it has. You get the certifications your product likely needs in each market, why each one applies, when it bites in your schedule, and the primary source behind every rule.
free review
Want an engineer to check your list?
Send the map to yourself, and get a free 15-minute review with an engineer: what's missing, what a pre-certified modulePre-certified radio module A ready-made radio subassembly already certified with FCC, ISED, and others, so a product can reuse its approvals instead of certifying a custom radio. Glossary → saves, and what to ask your lab.
About the rules
Three levels, one source per rule, open for review.
Required means needed to legally sell or ship, given what you selected. Likely means expected in practice (by retailers, insurers, or carriers) or required for most products like yours. Maybe means it depends on details the tool doesn't ask about.
Every rule is data, not code, so an engineer can audit it: view the raw rules (JSON). Costs and lead times appear only where an official source publishes them; everywhere else the honest answer is "get lab quotes."
This is a planning aid, not legal or compliance advice. It can't see every detail of your design, and the rules change. Confirm the final list with an accredited test lab, and with regulatory counsel for medical, children's, and food-contact products.
How archetype helps with this
Design it to pass, then walk it through the lab.
Most certification cost is set long before the lab: by the radio you pick, the board layoutPCB layout Placing components and routing copper connections on a printed circuit board, producing the fabrication and assembly files a factory builds from. Glossary →, and the enclosure. We make those choices with the test in mind.
Compliance-ready electronics
Module selection, layout, grounding, and EMI shielding chosen to pass emissionsEMI and EMC EMC means a device neither emits too much electromagnetic noise (EMI) nor malfunctions when exposed to it; most markets require testing to show both. Glossary → the first time. Firmware & electronics
Battery and power safety
Pack design, protection, thermal managementThermal management Getting heat out of electronics, motors, and batteries so every component stays within its temperature limits over the product's life and environment. Glossary →, and the documentation shipping and safety labs ask for. HVAC, buildings & power
A plan before DVT
A test plan, a lab, and the right units ready on the right date. Check your production readiness
FAQ
Questions founders ask
Do I need FCC certification, or just a declaration?
It depends on whether your product transmits. A product with digital electronics but no radio is an unintentional radiatorIntentional vs unintentional radiator FCC categories: intentional radiators deliberately transmit radio signals; unintentional radiators generate RF energy internally but aren't meant to emit it. Glossary → under FCC Part 15FCC Part 15 US rules on radio-frequency emissions from electronics: Subpart B for unintentional radiators, Subpart C for intentional ones such as Wi-Fi and BLE. Glossary → Subpart B, and most consumer devices like that can use a Supplier's Declaration of Conformity: you test at a lab and keep the records, with no FCC filing. Anything with Wi-FiWi-Fi Wireless LAN based on IEEE 802.11 that gives devices direct internet access through existing routers, at the cost of higher power use than BLE or Thread. Glossary →, Bluetooth, LoRaLoRa and LoRaWAN Long-range, low-power, low-data-rate wireless in unlicensed sub-GHz bands, suited to sensors that send small messages infrequently over long distances. Glossary →, NFC, or another transmitter is an intentional radiator and needs certification, which means a grant and an FCC ID issued through a Telecommunication Certification Body.
Can a pre-certified radio module save me testing?
Often, yes. If you integrate a module that already holds its own FCC, ISEDISED certification (Canada) Canada's radio and EMC approval regime, run by Innovation, Science and Economic Development Canada; similar to FCC rules, with its own requirements. Glossary →, or MIC approval and follow its integration conditions, you can usually rely on the module's radio approval instead of certifying the radio again. Your finished product still needs its own unintentional-radiator (EMC) testing, an RF exposure check if it is worn on the body, and, for Bluetooth, its own Bluetooth SIG listing.
Is UL certification legally required in the US?
For most consumer products, no federal law requires it. OSHA requires electrical equipment used in workplaces to be approved, which in practice means listed by a Nationally Recognized Testing Laboratory (UL, Intertek ETL, CSA, and others). Large retailers, insurers, and commercial buyers also commonly require a listing, so plan for it if you sell through those channels or plug into the wall.
What is pre-compliance testingPre-compliance testing Informal, lower-cost testing of prototypes against certification limits before the formal lab test, to find and fix problems while changes are still cheap. Glossary →, and is it worth it?
It is a quick, cheaper scan of emissions (and sometimes immunity or radio performance) on EVTEVT (engineering validation test) The first build of production-intent design, used to prove the engineering works: does the product meet its functional and performance requirements? Glossary → or DVTDVT (design validation test) The build stage where units made with production-intent tooling and processes are tested for reliability, compliance, and environmental performance. Glossary → units before the formal test. Finding a problem at EVT usually costs a layout tweak. Finding it at formal testing usually costs a board revision, new units, and a second round of lab fees.
How current is this, and can I rely on it?
The rules were last updated on 2026-10-21 and every one links to its primary source. Regulations change (the EU, for example, is phasing in new battery and cybersecurity rules through 2027), and the tool can't see every detail of your design. Use it to plan and to brief your lab. It is not legal or compliance advice; confirm the final list with an accredited lab.
More free tools: all tools · production readiness score · unit cost & NRE · battery life