Start here
Production readiness sprint
A short, fixed-scope review of your product by senior engineers — before you spend on toolingInjection mold tooling (soft vs hard) The molds that make plastic parts; soft tools are cheaper and faster but wear sooner, hardened steel tools cost more and last far longer. Glossary →, certification, or a production run.
- Architecture and control-loop review
- BOMBill of materials (BOM) The complete list of every part, quantity, and approved source needed to build a product; it drives purchasing, cost, and manufacturing. Glossary → cost, second sources, and lead-time risks
- DFMDesign for manufacturing (DFM) Designing parts and assemblies around how they will actually be made and put together, to cut cost, defects, and assembly time before tooling is made. Glossary → / DFA pass on mechanical and PCB
- Certification plan and pre-compliancePre-compliance testing Informal, lower-cost testing of prototypes against certification limits before the formal lab test, to find and fix problems while changes are still cheap. Glossary → checklist
- A written roadmap to production, with a quote for the build
fixed scope · about two weeks · credited toward the build
Or start smaller
48-hour written teardown
Send us your schematicSchematic The logical diagram of an electronic circuit showing every component and connection; the source of truth that the PCB layout and BOM are built from. Glossary →, BOM, CAD, or a prototype video. Within two business days you get a written teardown: the five things most likely to cost you time or money on the way to production, and what we'd do about each.
fixed scope
Project
A defined outcome — a board bring-up, a control loop, a DFM pass, a test fixtureTest fixture Custom hardware that holds a board or product and connects it to test equipment, so every unit can be tested quickly and repeatably on the production line. Glossary → — quoted up front and delivered on a schedule.
most common
Retainer
A reserved block of senior engineering hours each month. The shape most teams settle into once the first project lands.
leadership
CTO on demand
Technical leadership without a full-time hire: architecture, vendor and CMContract manufacturer (CM / EMS) A company that builds your product to your design and specifications; EMS providers specialize in electronics assembly, often with box build and test. Glossary → selection, hiring, investor diligence.
embedded
Forward-deployed engineer
An engineer working inside your team, in your tools and stand-ups, for a sprint or a season.