archetype

How we engage

Small first step. No long commitment.

Most teams start with a readiness sprint, keep the roadmap, and decide from there.

Start here

Production readiness sprint

A short, fixed-scope review of your product by senior engineers — before you spend on toolingInjection mold tooling (soft vs hard) The molds that make plastic parts; soft tools are cheaper and faster but wear sooner, hardened steel tools cost more and last far longer. Glossary →, certification, or a production run.

  • Architecture and control-loop review
  • BOMBill of materials (BOM) The complete list of every part, quantity, and approved source needed to build a product; it drives purchasing, cost, and manufacturing. Glossary → cost, second sources, and lead-time risks
  • DFMDesign for manufacturing (DFM) Designing parts and assemblies around how they will actually be made and put together, to cut cost, defects, and assembly time before tooling is made. Glossary → / DFA pass on mechanical and PCB
  • Certification plan and pre-compliancePre-compliance testing Informal, lower-cost testing of prototypes against certification limits before the formal lab test, to find and fix problems while changes are still cheap. Glossary → checklist
  • A written roadmap to production, with a quote for the build

  fixed scope · about two weeks · credited toward the build

A tiny banker's office inside a dollar-sign keycap

Or start smaller

48-hour written teardown

Send us your schematicSchematic The logical diagram of an electronic circuit showing every component and connection; the source of truth that the PCB layout and BOM are built from. Glossary →, BOM, CAD, or a prototype video. Within two business days you get a written teardown: the five things most likely to cost you time or money on the way to production, and what we'd do about each.

  written in 48 hours · then a call to walk you through it

Request a teardown
fixed scope

Project

A defined outcome — a board bring-up, a control loop, a DFM pass, a test fixtureTest fixture Custom hardware that holds a board or product and connects it to test equipment, so every unit can be tested quickly and repeatably on the production line. Glossary → — quoted up front and delivered on a schedule.

most common

Retainer

A reserved block of senior engineering hours each month. The shape most teams settle into once the first project lands.

leadership

CTO on demand

Technical leadership without a full-time hire: architecture, vendor and CMContract manufacturer (CM / EMS) A company that builds your product to your design and specifications; EMS providers specialize in electronics assembly, often with box build and test. Glossary → selection, hiring, investor diligence.

embedded

Forward-deployed engineer

An engineer working inside your team, in your tools and stand-ups, for a sprint or a season.

Questions

What does it cost?

It depends on scope and shape, so we don't put a number on it before we've seen the project and talked it through on a call. Every project is quoted up front, and retainers are a monthly block of hours.

Do you work remotely?

Yes. We're a remote studio and work with teams anywhere. When the work needs hands on, we visit or embed with your team on site, and hardware can ship to our bench.

We already have engineers. Where do you fit?

Usually at the seams — controls between firmware and mechanics, the jump from dev kit to custom board, DFM before tooling, certification before launch.

How fast can you start?

Briefs get a written reply within one business day, with a start date.

Start a project ↵
Ask an engineer